Home> News> How to install the injection valve of AILIPU JWM Series mechanical diaphragm metering pump.
March 08, 2023

How to install the injection valve of AILIPU JWM Series mechanical diaphragm metering pump.





First remove the pipe pressure cap and put the hose into the pipe pressure cap

Then connect it with the injection valve body

Make sure to connect them very tightly.



First remove the pipe pressure cap

Pipe pressure cap Pipe sleeve Pipe joint

Put the hose inside the pipe pressure cap and the pipe sleeve

Put the pipe joint inside the hose

Then connect it with the injection valve body

Make sure to connect them very tightly.

That`s all for the installation video, thanks for your watching.


Share to:

LET'S GET IN TOUCH

We will contact you immediately

Fill in more information so that we can get in touch with you faster

Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.

Send