Select Language

Home> Blog> Mechanical Diaphragm Metering Pump Installation_Mechanical Diaphragm Metering Pump Installation and Troubleshooting

Mechanical Diaphragm Metering Pump Installation_Mechanical Diaphragm Metering Pump Installation and Troubleshooting

July 08, 2021
Mechanical Diaphragm Metering Pump installation _ Mechanical Diaphragm Metering Pump installation process is more complicated, each step must be strictly installed product manual implementation. In addition, the installation may be completed after some failures may occur, Xiaobian today to explain to you all the mechanical diaphragm Metering Pump installation and troubleshooting, I hope for your help. Mechanical Membrane Metering Pump Installation_Mechanical Membrane Metering Pump Installation and Troubleshooting Mechanical Membrane Metering Pump Installation: 1. It is recommended that the suction line be self-filling with the suction side of the pump below the minimum level in the reservoir. If you must use suction lift installation, must be installed in the suction nozzle foot valve. 2.5 m water column is the maximum allowable suction height. 2. It is advisable to install a filter in the suction line for inspection and cleaning. At the same time must have the necessary stop valve and pipe live for future maintenance. 3. In the metering pump outlet pipeline must be installed pulsation buffer, safety valve. If the pressure is lower than 3Bar, it is recommended to install a back pressure valve to prevent the pipeline from siphoning. 4. The suction pipe diameter must be larger than the metering pump inlet valve size. Determine the diameter size must consider the metering pump peak flow, pipe length and material viscosity and other parameters. When the outlet line is not equipped with a pulsation damper, the diameter of the pipe must also be determined with reference to the suction pipe diameter. 5. Motor wiring must refer to the motor nameplate and operating instructions. 6. Disconnect metering pump outlet line or open line vent valve. 7. Press the level indicator to add the lubricant, then set the stroke to 0%. Start the metering pump to identify abnormal noise in the pump body. 8. Gradually increase the stroke to 100%, observe the metering pump outlet for material delivery, and the flow rate changes with the stroke. 9. Close the line vent valve or connect the outlet line to add material to the system. Mechanical diaphragm metering pump installation troubleshooting: 1. Motor overheating: a. Three-phase power phase loss b. Motor wiring is not correct c. Motor stuck d. Inverter control, the motor long-term operation in low-frequency environment. (It is suggested that the low frequency should be limited to 20Hz) 2. No flow at the pump outlet: a. The motor does not turn on b. There is no material or blockage in the inlet pipe c. Check valve blockage in inlet and outlet d. Incorrect installation direction of inlet and outlet check valves 3. Pump with operating noise: a. Turbine and worm normally run in. B. Incorrect lubricant filling position c. Bearing wear 4. No change in flow rate: a. Sliding crank break due to pulse free damper in outlet line 5 Leakage detection leak Material: a diaphragm rupture 6. Miss leak detection port: a oil seal rupture routine maintenance: 1. Lubricant to be replaced after 250 hours of initial operation. After every 2500 hours or six months to replace the oil. 2. Check the check valves and diaphragms every six months, and decide whether to replace them according to the actual conditions. 3. When the ambient temperature is lower than 100C, should replace the winter lubricant (Mobil626, etc.). (Editor: cloud sea)
Contact Us

Author:

Ms. LUO TING

Phone/WhatsApp:

+86 13958523160

Popular Products
You may also like
Related Information
How to distinguish between single screw pump, twin screw pump and three screw pump

How to distinguish single screw pump, twin screw pump and three screw pump: As the name suggests, a single screw pump is only a screw in the pump. Follow the habits of China's screw industry, naming,...

High temperature control valve selection

High temperature control valve is the working temperature is greater than 450 ℃ valve. Can be divided into 450 ~ 600 ℃, 600 ~ 700 ℃, 750 ℃ three categories. What are the main problems usually...

Float level gauge points of use

Float level gauge is widely used in liquid level, chemical industry, metallurgy, electric power, paper making, food and industrial sewage treatment and other departments. By the magnetic reed switch,...

Valve actuator you choose right?

Because more and more factories use automatic control, manual operation is replaced by mechanical or automation equipment, the executive body is required to act as an interface between the control...

Related Categories

Email to this supplier

Subject:
Email:
Message:

Your message must be between 20-8000 characters

We will contact you immediately

Fill in more information so that we can get in touch with you faster

Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.

Send