2022,10,21

When using the Metering Pump for the first time, attention should be paid to the flow calibration and standardization, metering pump in the factory are after normal temperature clear water performance test, and the test results and flow calibration curves are also listed in the certificate of conformity.e. The user should test and calibrate the pump after the first 12 hours of operation to obtain the accuracy of the pump flow in a given operating condition.

21

Pre-start preparation and checks


01
Check that the pump is securely mounted to the base, that the pipework is correctly installed and that the outlet pipework is open. If there is no lubricant in the pump body, add a sufficient amount of lubricant to the pump body, 650ml for the JXM-A model pump and approximately 3.2 liters for the JZM-A model pump, the pump case should preferably be filled with Mobil gear 600 xp22
02
Before the pump is powered on, the flow rate adjustment hand wheel is at zero scale. Check the suction and discharge lines to ensure that all shut-off valves are open before increasing the flow rate hand wheel from zero..
03
Start the metering pump and check the motor steering, the motor steering must be the same as the arrow on the motor mounting flange (clockwise rotation as observed from the motor airfoil side). If the steering is incorrect, change the wiring.
04
It is strongly recommended that the pump should be stopped at temperatures below -10°C.

Start-up and manual adjustment of the flow rate of the metering pump


Once the above required checks have been completed, the metering pump can be started. Observe the metering pump. Loosen the stroke locking bolt located on the pump adjustment seat in order to adjust the pump flow. adjusting the dial scale stroke adjustment knob changes the pump flow rate, JXM-A metering pump increases the flow rate clockwise and decreases it counterclockwise. JZM-A pump decreases the flow rate clockwise and increases it counterclockwise. The entire stroke adjustment range is marked in percentages, with a minimum interval of 1% on the hand wheel. After adjusting the knob to the required flow rate, the stroke locking bolt is tightened by hand to hold the set flow rate.

Metering pump delivery system filled with liquid


The venting of the pump suction and discharge lines is a very important step. For this reason the pump should be run without any discharge pressure prior to the pressure test, so that the delivery system is completely filled with fluid. A simple way to ensure filling is to install a three-way valve and check valve at the outlet connection of the pump. If the pump is not run for an extended period of time, changes in liquid temperature can create gas in the system. To vent the air, a valve should be installed on the outlet line to vent the gas through the process material when the pump is started.

Calibration of flow rates


After the first 12 hours of operation, the pump should be calibrated to find the exact flow rate for the specific operating conditions. Setting the pump flow rate at only 100%, 50% and 10% of the flow rate is usually sufficient to indicate the performance of the pump over the entire regulation range..
The flow rate of the pump can be calculated by measuring the change in liquid level of a calibration vessel. This method is recommended for calibrating hazardous liquids. The flow rate of the pump can also be calibrated by collecting and measuring the output liquid at the pump outlet, but it is necessary to establish the discharge head at the discharge point of the liquid to allow the pump to work accurately..

Notes:

It is recommended that this method of flow calibration should not be used in general, as it exposes the operator directly to dangerous liquids and may lead to accidents. In addition, the method of measuring the flow rate when the pump is likely to be in self-flow, so that the measured data will be larger than normal and the flow rate adjustment has little impact on the actual flow rate, for safety reasons, in the outlet line near the filling point of the high-pressure process vessel using a one-way check valve.

Contact Us

Author:

Ms. LUO TING

Phone/WhatsApp:

+86 13958523160

Popular Products
You may also like
Related Information
How to distinguish between single screw pump, twin screw pump and three screw pump

How to distinguish single screw pump, twin screw pump and three screw pump: As the name suggests, a single screw pump is only a screw in the pump. Follow the habits of China's screw industry, naming,...

High temperature control valve selection

High temperature control valve is the working temperature is greater than 450 ℃ valve. Can be divided into 450 ~ 600 ℃, 600 ~ 700 ℃, 750 ℃ three categories. What are the main problems usually...

Float level gauge points of use

Float level gauge is widely used in liquid level, chemical industry, metallurgy, electric power, paper making, food and industrial sewage treatment and other departments. By the magnetic reed switch,...

Valve actuator you choose right?

Because more and more factories use automatic control, manual operation is replaced by mechanical or automation equipment, the executive body is required to act as an interface between the control...

Related Categories

Email to this supplier

Subject:
Email:
Message:

Your message must be between 20-8000 characters

We will contact you immediately

Fill in more information so that we can get in touch with you faster

Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.

Send